ECD Architects
Longforgan Primary School 3-af1991c7

Longforgan Primary School

The Longforgan Primary School project involved the refurbishment and a new extension of an existing Grade B listed school, providing additional teaching accommodation along with a gym hall for school and community events. The new flexible and semi-open plan teaching spaces, provide a easy to navigate, light and airy environment for the students. While the west block acts as a connection to the building from 1908. The existing listed building accommodation has been reconfigured to provide a more efficient layout, with upgrades to the building fabric thermal performance, stonework repairs, replacement roof and windows. The new south block accommodates a large nursery facility with its own separate entry and play area enabling the children to play and learn in a completely secure environment. Adjacent to the nursery is the double-height gym / dining hall. Designed as a flexible space, this facility has been deliberately located and designed so that it can be isolated from the main school facilities and used for community events.

Project website: https://ecda.co.uk/projects/longforgan-primary-school/

Image gallery

Share: Facebook Twitter LinkedIn Email

Related projects

portfoliopic_3206-9fc33a4f

Knock Estate, Largs

2018 | Quarter Equestrian Centre, Largs | Private Client Equestrian Arena, Stables and Associated Accommodation at Quarter —…
Learn more
pilmuirworks_ext02_v4-lowres-aba6fe53

The Linen Quarter

Pilmuir works, a Category A listed building in Dunfermline, is a former extensive damask linen factory and warehouse…
Learn more